116 items: 108 met directly by a control at Level 3, 6 partly, 2 deliberately out of scope.
| Ref | Item (our description) | Controls | Note |
|---|---|---|---|
| Transparency 1 | Explain the what, how and why of the project in plain language to non-experts | POR-05 direct, TEC-05 partial, OPM-02 partial, GOV-09 partial | The business case states in plain language the problem the use solves, with options that include not using AI; documentation and published records explain the how. |
| Transparency 2 | Maintain detailed records of the project, including the decisions made in its design | POR-03 partial, GOV-06 partial, GOV-05 partial, POR-05 partial, RSK-03 partial, POR-04 direct | A record of key design decisions and assumptions, with reasons, is kept for each use and updated at each gate; owner, user need, supplier and impact assessments are recorded alongside. |
| Transparency 3 | Make information about a project or tool publicly available | GOV-09 direct | Published records for in-scope uses, with a recorded decision on publication for each inventory entry. |
| Transparency 4 | Use the ATRS if in mandatory scope; consider publishing a record even if not | GOV-09 direct | GOV-09 requires records in the required format and a reasoned publish decision for every inventory entry, which covers voluntary records. |
| Transparency 5 | Give appropriate disclosure when AI has been used to produce an output | GOV-10 direct, RSK-08 partial, TEC-02 partial | GOV-10 sets disclosure rules for AI content released externally and used internally for decisions or records. |
| Transparency 6 | Maintain records of all data sources, including collection methods, licences and preprocessing | DAT-08 direct, DAT-04 partial | DAT-08 records source, collection method, rights, licence and preparation steps; DAT-04 catalogues other data in use. |
| Transparency 7 | Publish DPIAs and EIAs where possible | GOV-09 direct, RSK-03 partial | For each use it is decided whether its impact assessments are published, with the reason recorded. |
| Transparency 8 | Maintain detailed records of all design decisions and assumptions behind a solution | POR-05 partial, TEC-05 partial, RSK-02 partial, POR-04 direct | A record of key design decisions and assumptions, with reasons, is kept for each use and updated at each gate. |
| Transparency 9 | Create and regularly update assurance documentation such as model cards or data set cards | TEC-05 direct, DAT-08 partial | TEC-05 documentation per version states purpose, intended users, limitations and where not to rely on it, checked at each release. |
| Transparency 10 | If possible, publish your source code openly | OPM-08 partial, POR-08 partial | Sharing solutions with peers and reuse inside are covered; no control asks for a decision on publishing code openly. |
| Transparency 11 | Build algorithmic tools with explainability in mind, to the degree the use case needs | TEC-02 direct, TEC-06 partial | TEC-02 builds in explainability and sets the degree needed by risk and audience; TEC-06 tests what was achieved. |
| Transparency 12 | Use technical methods such as SHAP or LIME to assess model interpretability | none | out of scope: choice of interpretability technique is technical method advice; TEC-06 already tests the explainability achieved. |
| Transparency 13 | Consult technical experts and current research when choosing explainability methods | none | out of scope: advice on selecting explainability methods is technical practice for build teams, not an adoption control. |
| Accountability 1 | Nominate an SRO, typically a senior decision maker, accountable for the project | GOV-05 direct | Named business owner for every use, recorded in the inventory. |
| Accountability 2 | Talk to the DPO and ensure they have the information, tools and authority to govern | DAT-05 partial, GOV-07 direct | Data protection advice is brought in at the start of design with authority to require changes, and data protection governance has a defined AI step. |
| Accountability 3 | Establish independent reviews to review and challenge data and AI decisions | MON-05 direct | Independent assurance by risk tier for all uses, with tracked findings. |
| Accountability 4 | Clarify legal responsibilities across the data and AI supply chain for all parties | RSK-04 direct, SEC-03 partial, OPM-04 partial | For each use, how legal obligations are split between suppliers, the organisation and users is recorded and each party is told its share. |
| Accountability 5 | When buying a system, define detailed responsibilities and liability contractually | OPM-04 direct, RSK-09 partial | Standard AI contract terms allocate responsibility and liability for AI outputs and harm, alongside data, IP, security split and audit. |
| Accountability 6 | Publish accessible information on how the AI system works and why it is ethical and lawful | GOV-09 direct, TEC-05 partial | Published transparency records cover purpose, data, logic and the measures taken. |
| Accountability 7 | Have mechanisms for users to give feedback, report errors or contest decisions | MON-06 direct, RSK-08 direct, OPM-07 partial | Feedback per use (MON-06), challenge with human review (RSK-08), problem reporting (OPM-07). |
| Accountability 8 | Establish a human in the loop to oversee outputs in risky or high-impact uses | RSK-07 direct | Oversight set by risk, with reviewer authority to override or stop. |
| Accountability 9 | Identify who is responsible for AI outputs and decisions, including LLM tools | GOV-05 direct, TEC-01 partial, GOV-01 partial | Named owners for every use, embedded and general tools included via the inventory; approved tools each have an owner. |
| Fairness 1 | Define fairness for the project and how to measure it across its life cycle | RSK-06 direct | Fairness measures defined per use, tested before release and monitored live. |
| Fairness 2 | Understand your users: groups most affected and links to protected characteristics | RSK-06 direct, RSK-03 partial | RSK-06 defines the groups at risk; RSK-03 covers equality impact. |
| Fairness 3 | Consider proxies for protected characteristics and be transparent about their use | RSK-06 direct, DAT-05 partial | Proxies for protected characteristics are identified for each in-scope use and their use is recorded with reasons. |
| Fairness 4 | Complete an EIA and consider publishing it with the DPIA and ATRS record | RSK-03 direct, GOV-09 partial | RSK-03 covers the equality assessment; publishing the assessment itself is not required. |
| Fairness 5 | Include diverse views: consider diversity of the team and contracted third parties | PPL-07 partial, GOV-04 partial, OPM-06 direct | Diversity of perspective is considered for each delivery team, including contracted third parties, with structured stakeholder input where it falls short. |
| Fairness 6 | Collect feedback and data throughout so the project stays fair and delivers benefits | MON-02 direct, MON-06 direct, MON-03 partial | Live fairness monitoring, user feedback and benefits tracking. |
| Fairness 7 | Regularly update your EIA | RSK-03 direct | Impact assessment kept current during use. |
| Privacy 1 | Involve information governance teams early in the project design process | GOV-07 direct, DAT-05 partial, OPM-06 partial | Information governance and data protection advice are brought in at the start of design, with authority to require changes. |
| Privacy 2 | Record purpose and benefit of data collection and use it to prevent scope creep | DAT-05 direct, MON-02 partial | Recorded purpose and compatibility check per use; MON-02 watches for use outside the approved purpose. |
| Privacy 3 | Embed privacy by design and default and undertake a DPIA | OPM-06 direct, RSK-03 direct, DAT-05 partial | Privacy by design with protective defaults (OPM-06) and a privacy impact assessment (RSK-03). |
| Privacy 4 | Adopt data minimisation: collect and process the least data the purpose needs | DAT-05 direct, DAT-07 partial | Data collected and processed for each use is limited to what the purpose needs. |
| Privacy 5 | Facilitate data subjects' rights to access and correction, with meaningful consent | DAT-05 direct | Rights requests handled, including for training data, on a recorded lawful basis. |
| Privacy 6 | Use privacy enhancing technologies such as anonymisation or synthetic data | DAT-05 direct, DAT-08 partial | Privacy enhancing techniques are considered wherever personal data is used, with the decision recorded. |
| Privacy 7 | Share data responsibly under a privacy-preserving governance regime and agreements | DAT-07 direct, DAT-05 partial, DAT-06 partial | Sharing follows documented agreements; lawful basis and retention sit with DAT-05 and DAT-06. |
| Privacy 8 | Consider additional privacy risks AI brings, such as re-identification or leakage | RSK-03 direct, SEC-04 direct, TEC-08 partial | Privacy and sensitive inferences in the impact assessment; leakage rules for AI tools; detection of unapproved public tools. |
| Privacy 9 | Provide clear privacy notices and give users free choice to configure settings | DAT-05 direct, OPM-06 partial | People told accessibly how their data is used; privacy-protective defaults in OPM-06. |
| Privacy 10 | Prepare for breaches with clear plans and assigned responsibilities | SEC-05 direct, MON-04 partial | Security incident playbooks with breach notification routes and trained responders. |
| Privacy 11 | Plan for decommissioning: data archival or deletion at an appropriate time | POR-09 direct, DAT-06 direct | Retirement covers disposal or retention of models and data, under records rules. |
| Environmental sustainability 1 | Explore alternative solutions, including simple and low-energy options, before selecting | OPM-02 direct | Configure, procure, build or wait decision with environmental footprint as a criterion. |
| Environmental sustainability 2 | Consider reuse of existing models, favouring open-source models over retraining | OPM-02 direct, POR-08 partial, OPM-08 partial | Reuse of existing and openly available models is considered before training new ones. |
| Environmental sustainability 3 | Select suitable metrics for measuring and assessing environmental impact | RSK-03 partial, MON-01 direct | Measures for each use include environmental footprint (energy, compute, water) where material, with a baseline; the impact assessment covers environmental effects. |
| Environmental sustainability 4 | Evaluate sustainability credentials of third-party providers, including renewable energy use | RSK-09 direct | Supplier due diligence covers energy use and wider sustainability practice. |
| Environmental sustainability 5 | Raise awareness of the environmental and social impact of digital technologies | PPL-01 direct | The literacy baseline required for all staff covers the environmental and social impact of AI use, which brings sustainability into training. |
| Societal impact 1 | Write down project objectives in non-technical terms before choosing a technical solution | POR-05 direct, STR-01 partial | The business case states the problem in plain language and weighs options, including not using AI, before approval at the gate. |
| Societal impact 2 | Involve diverse stakeholders, especially those most affected, in design and testing | OPM-10 direct, OPM-06 partial, CUL-08 partial, CUL-03 partial | Participants who represent the people served and engagement of affected communities (OPM-10); user research and testing with users (OPM-06); public views in design (CUL-08); staff (CUL-03). |
| Societal impact 3 | Complete an Equality Impact Assessment | RSK-03 direct | Equality is part of the impact assessment before go-live. |
| Societal impact 4 | Use feedback mechanisms such as surveys and advisory boards to shape outcomes | MON-06 direct, CUL-08 partial | Feedback per use reviewed and acted on; CUL-08 gathers public views. |
| Societal impact 5 | Make sure you have meaningful human control at the right stages | RSK-07 direct | Oversight model per use set by risk. |
| Societal impact 6 | Continuously evaluate and improve the project, including decommissioning when no longer useful | POR-04 direct, POR-09 direct, MON-03 partial | Stage gates from idea to retirement; retirement triggered by periodic review with user transition. |
| Safety 1 | Make sure researchers and research participants are physically and emotionally safe | OPM-10 partial | Research with participants has informed consent and ethics review and protects their wellbeing and right to withdraw; the safety of the researchers themselves is not addressed. |
| Safety 2 | Comply with security requirements and standards such as Secure by Design | SEC-01 direct, OPM-06 partial | Recognised security baseline applied to every use before go-live. |
| Safety 3 | Apply data minimisation to limit the potential harms of a data breach | DAT-05 direct, DAT-07 partial | Data collected and processed for each use is limited to what the purpose needs, which covers personal data. |
| Safety 4 | Keep all data secure throughout the project | SEC-04 direct, DAT-07 partial, SEC-01 partial | Information protection rules and technical measures on AI tools, with least privilege access. |
| Safety 5 | Check for data quality, accuracy or reliability issues such as drift or poisoning | DAT-03 direct, MON-02 direct, SEC-02 partial | Data quality assessed before and during use; drift monitored live; poisoning as an AI threat. |
| Safety 6 | Ensure human oversight and strategies to intervene, especially in high-risk uses | RSK-07 direct | Oversight with authority to override or stop. |
| Safety 7 | Run rigorous testing to find failure modes, including red teaming | TEC-06 direct, SEC-06 partial | Testing against criteria, edge cases and harmful output (TEC-06), with safeguard bypass and independent security testing for higher risk (SEC-06). |
| Safety 8 | If the system cannot be made sufficiently safe, do not use it | RSK-01 partial, GOV-03 direct, POR-07 partial | A use whose residual risk cannot be brought within the risk appetite is not approved, or is stopped. |
| Safety 9 | Use available resources, including courses on risks and ethics | PPL-01 direct, PPL-05 partial | The literacy baseline covers risks and the adopted ethical principles for all staff; role pathways add specific risk duties. |
| Trade-offs 1 | Include stakeholder perspectives by engaging with affected communities | CUL-08 direct, CUL-03 partial | Views of the people served gathered and considered in design. |
| Trade-offs 2 | Consult legal and human rights frameworks so decisions align with standards | RSK-04 direct, RSK-03 partial | Obligations register used at design with legal advice; rights in the impact assessment. |
| Trade-offs 3 | Balance proportionality and necessity | RSK-05 direct, DAT-05 partial | Where principles conflict, the trade-off is tested for necessity and proportionality through the review route. |
| Trade-offs 4 | Ensure meaningful and inclusive deliberation | GOV-04 partial, RSK-05 partial | Trade-offs between principles go through the review route and are recorded with alternatives and reasons, and the oversight forum is diverse; the review route itself is not required to be inclusive. |
| Trade-offs 5 | Establish mechanisms to monitor outcomes and adjust if necessary | MON-02 direct, RSK-03 partial | Live monitoring against thresholds with named responders. |
| SAT 1.1 | Describe the problem you are trying to solve in non-technical terms | POR-05 direct, POR-03 partial | The proportionate business case for every use states the case for change, benefits and options; the pipeline register holds the proposal but not the problem statement itself. |
| SAT 1.2 | Describe the project purpose and user need | OPM-06 direct, POR-05 partial, GOV-06 partial | User research under the delivery standards establishes the user need; purpose is recorded in the business case and, once live, the inventory. |
| SAT 1.3 | Have you consulted your organisation's DPO? | DAT-05 direct, GOV-07 partial | Each use of data is signed off with data protection advice before use; GOV-07 gives data protection its AI step. |
| SAT 1.4 | Have you consulted your organisation's data and information security teams? | GOV-07 direct, SEC-01 partial, SEC-02 partial | Information management and security governance each have a defined AI step that the AI route calls on; the security baseline and threat model bring security teams in per use. |
| SAT 1.5 | Are you using any personal or sensitive data? Consider the privacy impact | DAT-04 direct, DAT-05 direct, RSK-03 partial | The catalogue records sensitivity and whether data holds personal data; lawful basis and fairness are recorded per use, and the impact assessment covers privacy. |
| SAT 1.6 | Have you conducted a DPIA, and how will identified risks be mitigated? | RSK-03 direct, DAT-05 partial, GOV-07 partial | The impact assessment covers privacy, is signed off before go-live and tracks mitigations; DAT-05 feeds it and GOV-07 ties in the existing DPIA process. |
| SAT 1.7 | What data sharing agreements are in place, and are they proportionate and privacy protecting? | DAT-07 direct, DAT-05 partial | Sharing follows documented agreements approved by the data owner; proportionality to the purpose comes from the DAT-05 purpose and fairness check. |
| SAT 1.8 | What governance structures support safe, effective and responsible implementation? | GOV-04 direct, RSK-05 direct, GOV-03 partial, GOV-07 partial | Oversight forum and an ethics review route with authority to require changes; decision rights tiered by risk set which structures review each use. |
| SAT 1.9 | How have you assigned responsibility for outcomes? Can owners make necessary changes? | GOV-05 direct, GOV-03 direct, CUL-04 partial | Named business, data, technical and assurance owners per use, with decision rights to change or retire; concerns raised are acted on through CUL-04. |
| SAT 1.10 | What process documents project decisions and builds an evidence base for them? | POR-03 direct, POR-04 direct, TEC-05 partial | Decision history and gate decisions are recorded in the pipeline register; design records for audit come through TEC-05 documentation. |
| SAT 1.11 | If conducting research, how are researchers and participants kept safe? | OPM-10 direct | Evaluations and user research involving people need informed consent and ethics review through the established route, which covers risks to participants and researchers. |
| SAT 1.12 | How are you ensuring diversity and representation in your project team? | OPM-06 direct, PPL-07 partial, GOV-04 partial | Diversity of perspective is considered for each team, with structured stakeholder input where it falls short. |
| SAT 1.13 | Who are your users, and how might groups be impacted unequally? | RSK-03 direct, RSK-06 direct, OPM-06 partial | The equality impact assessment and defined groups at risk cover unequal impact; users and their needs come from user research. |
| SAT 1.14 | How are you involving diverse stakeholders and affected groups in planning, design and development? | OPM-10 direct, OPM-06 partial, CUL-08 partial, CUL-03 partial | For significant uses, affected communities and experts who are not users are engaged at planning and design (OPM-10), and user research continues through development (OPM-06). |
| SAT 1.15 | Have you consulted civil society and domain experts? What risks and opportunities were recorded? | OPM-10 direct, STR-07 partial, CUL-08 partial | For significant uses, affected communities and experts who are not users are engaged at planning and design, with their input and the response recorded. |
| SAT 1.16 | Are you researching environmental impact, and is it shaping early decisions? | OPM-02 direct, RSK-03 partial | The configure, procure, build or wait decision for every use weighs environmental footprint; the impact assessment covers environmental effects before go-live. |
| SAT 2.1 | How are you implementing safety principles from the start of your project? | OPM-06 direct, TEC-06 partial, SEC-02 partial, GOV-07 partial | Delivery standards require safety, security and privacy by design, with accuracy, robustness and reliability requirements set at design. |
| SAT 2.2 | What processes assess and resolve data quality issues? | DAT-03 direct | Quality requirements per use, assessed before use and at intervals, with owned remediation. |
| SAT 2.3 | How are you communicating the system's purpose, design and outcomes to stakeholders? | TEC-05 direct, GOV-09 partial, CUL-02 partial | Documentation per version states purpose, users, how it works, inputs, outputs and limits, suited to each audience; public records and internal communication add reach. |
| SAT 2.4 | How are you communicating with individuals about how their data is used? | DAT-05 direct | People whose data or inputs are used are told accessibly how they are used, accessed and stored. |
| SAT 2.5 | How will outputs be clearly explained and understood by stakeholders and users? | TEC-02 direct, TEC-06 partial, RSK-08 partial | The degree of explainability is set per use by risk and audience and built into patterns; testing checks what was achieved. |
| SAT 2.6 | What privacy enhancing methods have you integrated into your project? | DAT-05 direct, OPM-06 partial, DAT-07 partial | Privacy enhancing techniques are considered and recorded for personal data used in training or tuning; privacy by design and minimised test data cover other stages. |
| SAT 2.7 | What plan is in place for fairness testing? | RSK-06 direct, MON-06 partial | Fairness measures and testing before release under a documented approach; user feedback adds a non-technical source. |
| SAT 2.8 | How are you identifying and mitigating biases in your data sets? | RSK-06 direct, DAT-03 direct | Bias management across the lifecycle, and data quality requirements that include representativeness. |
| SAT 2.9 | How are diverse needs captured and integrated into prototype development? | RSK-03 direct, OPM-06 partial, OPM-10 partial | The equality impact assessment covers the Public Sector Equality Duty; user research (OPM-06) with participants who represent those served (OPM-10) informs design. |
| SAT 2.10 | What would be the harm in not doing the project? | POR-05 direct | The business case states benefits and options, which include not proceeding. |
| SAT 2.11 | Consider trade-offs between ethical principles and alternatives. Why prioritise the chosen solution? | RSK-05 direct, RSK-02 partial, OPM-02 partial | Where principles conflict, the trade-off is recorded with the alternatives considered and the reasons for the choice. |
| SAT 2.12 | What plan is in place for measuring and reducing environmental impact? | RSK-03 partial, OPM-02 partial, MON-01 partial | Environmental footprint is measured with a baseline and environmental mitigations are tracked, but no control asks for a reduction plan or target set against those measures. |
| SAT 3.1 | How have you considered the accuracy, representativeness and completeness of your data set? | DAT-03 direct, RSK-06 partial, MON-02 partial | Data quality requirements include relevance and representativeness, with shortfalls mitigated; proxy discrimination and future monitoring sit in RSK-06 and MON-02. |
| SAT 3.2 | How have you evaluated and addressed fairness in your AI system before going live? | RSK-06 direct, TEC-06 partial | Groups at risk and fairness measures are defined, tested before release and mitigated. |
| SAT 3.3 | How are you ensuring accessibility for all users? | OPM-06 direct, RSK-03 partial | Services, documentation and notices are tested with users who have accessibility needs before go-live. |
| SAT 3.4 | How have you designed and tested human oversight mechanisms? | RSK-07 direct, GOV-05 partial, CUL-04 partial | The oversight model is set per use, and its design is tested before go-live to show reviewers can detect problems and intervene in time. |
| SAT 3.5 | Is documentation in place so others can replicate your process, results and outputs? | DAT-08 direct, TEC-05 direct, TEC-06 partial | Data sources and preparation linked to models, versioned models, prompts, configuration and data sets, and recorded test results. |
| SAT 3.6 | Have you checked whether the project is in scope of the ATRS? | GOV-09 direct, RSK-04 partial | For each inventory entry a publication decision is made against the applicable criteria, with the reason recorded. |
| SAT 3.7 | How are you integrating environmental monitoring into development? | RSK-09 partial, OPM-02 partial, RSK-03 partial, MON-01 partial | Footprint shapes the sourcing choice, supplier energy and sustainability are assessed and a baseline is set before go-live, but environmental measures are not tracked through development. |
| SAT 3.8 | Could the project affect employment, working conditions or skills? Who gains or loses? | PPL-06 partial, CUL-01 partial, CUL-03 partial, CUL-07 partial, RSK-03 direct | The impact assessment for each use covers workforce effects (workload, working conditions, skills and progression) alongside equality; workforce plans add the organisation view. |
| SAT 3.9 | What go or no-go criteria apply before going live, and what would cause delay? | POR-04 direct, GOV-03 direct, POR-07 partial, MON-01 partial | Gate exit criteria proportionate to risk, and decision rights naming who approves go-live. |
| SAT 3.10 | How will you transition to live, and who will own the system afterwards? | GOV-05 direct, OPM-07 direct, POR-03 partial, OPM-01 partial | Formal ownership handover with residual risk acceptance and a support owner for every live service; the register entry moves to the inventory. |
| SAT 4.1 | How are you monitoring performance in deployment and responding if it degrades or becomes unsafe? | MON-02 direct, OPM-09 direct, MON-01 partial, TEC-05 partial | Live monitoring against thresholds with named responders, tested fallbacks with users told, and rollback to a known good version. |
| SAT 4.2 | How are logs and documentation maintained to support investigations and transparency? | DAT-06 direct, MON-02 partial, TEC-05 partial, SEC-01 partial | Records rules cover inputs, outputs, decisions and system logs, retrievable for every use; event logging and version documentation support them. |
| SAT 4.3 | What mechanisms let users submit feedback on system performance? | MON-06 direct, OPM-07 partial | Every live use has a feedback route for users and affected people; OPM-07 adds a problem reporting route. |
| SAT 4.4 | How are you actioning user feedback to improve the project? | MON-06 direct, TEC-05 partial | Feedback is reviewed on a set cycle with actions recorded; users are told of planned changes under TEC-05. |
| SAT 4.5 | Can the rationale for outputs be explained understandably to users and affected individuals? | RSK-08 direct, TEC-02 partial | People affected by AI-supported decisions can obtain a meaningful explanation. |
| SAT 4.6 | How are you notifying users they are interacting with AI rather than a human? | RSK-08 direct, GOV-10 partial, TEC-02 partial | People are told at first contact, clearly and accessibly, when interacting with AI; content disclosure and machine-readable marking support it. |
| SAT 4.7 | If within mandatory scope, have you published an ATRS transparency record? | GOV-09 direct | Records are published for all in-scope uses in the required format. |
| SAT 4.8 | How long will data be retained, and what justifies that period? | DAT-06 direct, DAT-05 partial | Retention rules for AI inputs, outputs and decisions are applied to every use; purpose limitation under DAT-05 supports the justification. |
| SAT 4.9 | What monitoring and interventions detect and prevent misuse of the system? | MON-02 direct, SEC-01 partial, TEC-02 partial, GOV-03 partial | Live monitoring covers misuse and use outside the approved purpose, with named responders; guardrails and security monitoring add prevention. |
| SAT 4.10 | What procedures are in place to safely stop or retire the system? | OPM-09 direct, POR-09 direct, MON-09 partial, SEC-05 partial | Documented safe stop and fallback in continuity plans with recovery objectives, plus a planned retirement process. |
| SAT 4.11 | Will people affected by shutdown or replacement be told? What are the wider impacts? | POR-09 direct, OPM-09 partial, GOV-09 partial | Retirement assesses the effect of withdrawal on affected people and services, identifies groups at greater risk and tells users and affected people in advance. |
| SAT 4.12 | How will you monitor environmental impact after deployment and respond if it rises? | RSK-03 partial, MON-01 partial | Environmental footprint is measured against a baseline and the impact assessment is kept current, but live monitoring of footprint against a threshold, with a named response, is not required. |
| SAT 4.13 | What measures responsibly manage or recycle hardware and infrastructure? | POR-09 direct, RSK-09 partial | Retirement covers reuse, recycling or disposal of dedicated hardware and infrastructure; supplier due diligence on wider sustainability practice reaches hardware owned by providers. |
References and short descriptions only; see the source publication for its own text. The cross-reference is the author's interpretation and is not endorsed by the publisher. See notices.